SAP Knowledge Base Article - Preview

2626424 - Controls with ABAP report did not finish

Symptom

When schedule a control with the program, there are Job steps executed on the backend Systems and results in the spool. However these results are not being retrieved by the GRC System. The Job steps are shown as 'In Progress' and no activity is visible anymore on the backend system.

Ex:

There is report added the reports for data source in plugin system with report /GRCPI/GRIA_AM_OVERVIEW_AR.   Since then there is problem, that the maintained jobs didn't finished yet.  Added the program RSUSR100N with variant "1" to the table and select it in the GRC.


Read more...

Environment

GRC Process Control 10.1

Product

SAP Process Control 10.1

Keywords

Maintain Connectors and Connection Types, in progress, GRCPI/GRIA_AM_OVERVIEW_AR. , KBA , GRC-SPC-AC , Automated Controls , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.