Symptom
During a system update using Software Update Manager (SUM) or SAPup tool in the downtime phase MAIN_NEWBAS/TABIM_UPG 100% memory consumption is experienced, especially when the language packages get imported. The R3trans processes are showing the trend of every growing memory consumption.
Example:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
MAIN IMPORT ERRORS and RETURN CODE in SAPILHU618GAERP608F2.Z02
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
4 ETW000 E071-LOCKFLAGs 000998 - 001025 updated ('2', 28 entries).
4 ETW690 COMMIT "3928" "14688168"
4 ETW675 end import of "LANGTABURSRD_ATTR_GROUPT".
4 ETW675 end import of "LANGTABUT7RO17T".
4 ETW000 0 d / 35 i / 157 u / 2868 = 93% ucf FPLAYOUTT
1AETP000 R3trans received signal 9 from operating system.
1 ETP111 exit code : "13"
Read more...
Environment
Based on NetWeaver release
Product
SAP ERP 6.0 ; SAP NetWeaver 2004 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0
Keywords
EHP8, SUM 2.0, r3transoptions, table cache size, tcs, FPLAYOUTT , KBA , BC-CTS-TLS , Transport Tools , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.