SAP Knowledge Base Article - Preview

2633269 - Processing delay in PI JDBC Receiver messages

Symptom

  • A scenario has been configured using Process Integration (PI) or Process Orchestration (PO) JDBC Receiver Adapter connecting to a third party Database (DB)
  • Slow message processing times and/or a build up of messages in the messaging queues can be observed in this scenario.
  • Messages will be in Delivering status and/or To Be Delivered for longer time than expected
  • In the Audit Log a processing delay is observed between these steps:
    2018-01-01 10:14:16.111 JDBC_SUC_501
    2018-01-01 10:30:02.32 JDBC_SUC_204
  • Eventually, an error message like below will be thrown: 
    Message processing failed. Cause: com.sap.engine.interfaces.messaging.api.exception.MessagingException: Error when attempting to get processing resources: com.sap.aii.af.lib.util.concurrent.ResourcePoolException: The resource pool has already been destroyedError when attempting to get processing resources: com.sap.aii.af.lib.util.concurrent.ResourcePoolException: The resource pool has already been destroyed


Read more...

Environment

  • SAP NetWeaver
  • SAP Process Integration

Product

SAP NetWeaver 7.5 ; SAP NetWeaver all versions ; SAP Process Integration all versions

Keywords

Process Integration, PI, Process Orchestration, PO, NetWeaver, XI, AEX, performance, Oracle, DB2, Sybase, MS SQL , KBA , BC-XI-CON-JDB , JDBC Adapter , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.