SAP Knowledge Base Article - Preview

2641104 - Engineering Change Order Type Single Date Validity Order does Not allow to Change Valid From Date in Bill of Material

Symptom

Unable to change the Valid from Date of Engineering Change Order  in Production Bill of Material.


Read more...

Environment

SAP Business ByDesign

Product

SAP Business ByDesign all versions

Keywords

Engineering Change Order Type - Single-date Validity Order, Cannot Change Valid from Date in BoM, Single Date Validity Order does Not allow to Change Valid From Date in Bill of Material , KBA , eco type - single-date validity order , cannot change valid from date in bom , AP-ECP-ECO , Engineering Change Order , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.