Symptom

  • SAP Transportation Management used in planning a Freight Unit (FU) to a Freight Order (FO) or a Freight Booking (FB). 
  • Pick-Up/Delivery (PUDL) time windows are maintained in the FU. Specifically, either the Acceptable PU time window or the Acceptable DL time window are maintained. 
  • For planning, either the Automatic planning (VSR Optimizer) or Manual Planning (MP) with Scheduler (VSS Scheduler) is used. 
  • Planning results in the Loading time duration extending beyond the Acceptable PU time window, or the Unloading time duration extending beyond the Acceptable DL time window. For example:
    PUDL Loading.jpg
    Here, the Unloading Start Date/Time precedes the Delivery Start Date (Acceptable)
  • There is a business requirement to constrain Loading/Unloading time duration within a specified time window at a Location. How can that be achieved?


Read more...

Environment

  • SAP Transportation Management 9.x

Product

SAP Transportation Management 9.0 ; SAP Transportation Management 9.1 ; SAP Transportation Management 9.2 ; SAP Transportation Management 9.3 ; SAP Transportation Management 9.4 ; SAP Transportation Management 9.5

Keywords

PUDL, VSR, VSS, TVSR, TVSS, FO, FB, Freight Document, FU, FUBR, PLN, sales order scheduling erp os resource , KBA , TM-PLN-MP , Manual Planning , TM-PLN-VSR , Vehicle Scheduling and Routing (VSR) , Problem