Symptom
-
After a recent upgrade, transaction CJ27 results in a RAISE_EXCEPTION dump with exception "PARAMETERS_NOT_VALID" in function module CX_SCHED_VIA_OPERATING_TIME.
-
When creating a project in the Project Planning Board(PPB), a scheduling error message occurs "Date cannot be converted into the internal format" Message no. C7022 (despite having dates which come after 01.01.1980 and before 01.01.2048).
Read more...
Environment
- SAP ERP Project System (PS)
- SAP R/3
- SAP R/3 Enterprise
- SAP ERP Central Component
- SAP ERP
- SAP Enhancement package for SAP ERP
- SAP Enhancement package for SAP ERP, version for SAP HANA
Product
Keywords
CJ20N, runtime error, SAPLCXOT, LCXOTU01, SAPLCJTR, template, CJ2B, CJ2C, patch level, copy project, C7 022, CX_OPR_SCHEDULE, OBTYP=NVO, VRGNG=RMTM, TJ05, C7 022, CN22, CN24 , KBA , PS-DAT-NET , Network Scheduling , PS-ST-PB , Project Builder , PS-ST , Structures , PS , Project System , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.