SAP Knowledge Base Article - Preview

2685402 - IBP: Unable to limit scope of planning view by Subnetwork in Excel

Symptom

  • The Planning Unit (Subnetwork) selection in the Planning Scope settings of the planning view is not available (the section in the red box):
    planning view with subnetwork.PNG
  • The attribute PLUNITID (subnetwork) is correctly assigned to the planning area through the PLANNINGUNIT master data.
  • The attribute PLUNITID is a member of the LOCATIONPRODUCT master data.
  • In this situation, you can receive the error "You need to specify a subnetwork" in a pop-up when trying to run the S&OP Operator from Excel, which causes the operator to fail.

"Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental."


Read more...

Environment

SAP Integrated Business Planning (SCM-IBP)

Product

SAP Integrated Business Planning for Supply Chain all versions

Keywords

ibp, inv, sop, you, need, to, specify, subnetwork, plunitid, planning, unit, planningunit, subnetwork, heuristic , KBA , SCM-IBP-SUP , Supply , SCM-IBP-XLS , Excel Client , SCM-IBP-INV , Inventory Planning , SCM-IBP-XLS-UI , SAP IBP, add-in for Microsoft Excel (User Interface) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.