Symptom
You have maintained a periodic lot size in the location product master and a time dependent safety stock. The stock on hand projected might be below the desired target stock for periods in the period group. For the last period of the period group the result is as expected, the stock on hand projected is exactly the target stock or above target stock level.
Read more...
Environment
- SAP Supply Chain Management
- Advanced Planner and Optimizer
- Supply Network Planning (SNP)
- SNP Heuristic
Product
SAP Supply Chain Management 2005 ; SAP Supply Chain Management 2007 ; SAP Supply Chain Management 4.0 ; SAP Supply Chain Management 4.1 ; SAP Supply Chain Management 7.0 ; SAP enhancement package 1 for SAP Supply Chain Management 7.0 ; SAP enhancement package 2 for SAP Supply Chain Management 7.0 ; SAP enhancement package 3 for SAP Supply Chain Management 7.0
Keywords
Periodische Losgröße, periodical, periodic, period, Zielbestand , KBA , SCM-APO-SNP-HEU , SNP Heuristic Planning , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.