SAP Knowledge Base Article - Preview

2690940 - App Close Period for Product Master uses wrong time or date

Symptom

  • Planned Start date for Scheduled Job for Closing Periods for Product Master is at 31st of the month instead of the expected 1st of the month.
  • App 'Close Period for Product Master' tries to close a period not defined in the "Scheduling Options" or "Parameters" of the Job
  • Period Closing App returns 'Incorrect period in control rec. of CoCd; no conversion here. The control record has the current period (month/year)" when run through the Fiori app Close Period for Product Master
  • App 'Close Period for Product Master' is expected to run on the first day of the Month but tries to close previous Month incorrectly
  • 'Close Period for Product Master' scheduled job runs correctly for part of the year but fails on months where daylight saving time is active. 

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.


Read more...

Environment

 SAP S/4HANA Cloud Public Edition

Product

SAP S/4HANA Cloud Public Edition all versions

Keywords

Material Master, Product Master, MARV, Greenwich UK with DST, GMTUK, CET, Schedule Job for Closing Periods, CEST, UTC, UTC+1, UTC+2, daylight saving, DST, CEST, Europe/Madrid, Europe/Berlin, summer time, winter time, 00:00:01, scheduling time, wrong day, UTC timezone, timezone field. , KBA , LO-MD-MM-2CL , Product Master for Public Cloud , BC-SRV-APS-APJ , Catalog based application job , LO-MD-MM , Material Master , LO-MD-FIO-MM , Fiori UI for Product Master , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.