SAP Knowledge Base Article - Preview

2704533 - Scheduled tasks in Java scheduler trigger multiplied jobs

Symptom

Scheduled tasks are multiplied, each is triggering the respective jobs on different server nodes in specific status.


Read more...

Environment

As of SAP NetWeaver AS Java 7.3.

Product

SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.3

Keywords

Java, scheduler, task, job, multiple, execute, lock, trigger, restart, DeleteExpiredTokensJob, server nodes, Task ID, multiply, double , KBA , BC-JAS-BTC , NetWeaver Scheduler (Java) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.