SAP Knowledge Base Article - Preview

2706898 - Optimizer creates multiple Freight Documents when route exists through Transhipment Locations in SAP Transportation Management

Symptom

  • You have a demand document (for example, Freight Unit) going from A to C.
  • Locations are connected via a Transshipment Location B.
  • You are not switching means of transport or carrier at the Transhipment Location.
  • The optimizer creates 2 capacity documents (for example, Freight Orders); although, you expect it to only create one.
  • Is there a way to create a single capacity document which consists of 2-stages in this scenario?


Read more...

Environment

SAP Transportation Management 9.x

Product

SAP Transportation Management 9.0 ; SAP Transportation Management 9.1 ; SAP Transportation Management 9.2 ; SAP Transportation Management 9.3 ; SAP Transportation Management 9.4 ; SAP Transportation Management 9.5

Keywords

VSR, optimizer, planning, multiple stages, location, lane, transshipment location, via location, rcc_log, FO, FB, FU, TU , KBA , TM-PLN , Planning , TM-PLN-VSR , Vehicle Scheduling and Routing (VSR) , TM-PLN-VSR-OPT , Optimizer , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.