Symptom
You are using a mapping with the standard function currentDate from the function category Date. You have noticed that the function returns a different result in your 7.10 or 7.31 or 7.40 system than it returns in your 7.50 system.
You use currentDate with format: yMMdd (or any other format where only y or yy is included). The day of the test in this example is 2018. November 1 (20181101).
- In your 7.10, 7.11, 7.30, 7.31 and 7.40 system the currentDate functions returns 181101.
- In your 7.50 system the currentDate functions returns 20181101.
Read more...
Environment
- SAP NetWeaver 7.1
- SAP enhancement package 1 for SAP NetWeaver 7.1
- SAP NetWeaver 7.3
- SAP enhancement package 1 for SAP NetWeaver 7.3
- SAP NetWeaver 7.4
- SAP NetWeaver 7.5
Product
Keywords
Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.40, PI 7.40, PO 7.40, Process Orchestration 7.50, PI 7.50, PO 7.50, NetWeaver, XI, AEX, currentDate, JVM, Java 6, Java 8, mapping, Date, java.util.Date , KBA , BC-XI-IBD-MAP , Integration Builder Design - Mapping , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.