SAP Knowledge Base Article - Preview

2716014 - GC overhead limit exceeded in PI ESR

Symptom

  • You are working with the Process Integration (PI) or Process Orchestration (PO) Integration Builder tools i.e. Enterprise Services Repository (ESR) and/or Integration Builder Directory. 
  • When opening/saving/modifying objects you get the error pop-up GC overhead limit exceeded

    GC limit exceeded.png


Read more...

Environment

  • SAP NetWeaver
  • SAP Process Integration

Product

SAP NetWeaver 7.5 ; SAP Process Integration all versions

Keywords

Process Integration 7.0, PI 7.0, PI 7.01, PI 7.02, Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.4, PI 7.4, PO 7.4, Process Orchestration 7.5, PI 7.5, PO 7.5, NetWeaver, XI, , AEX, ESR, memory, outofmemory, OOM,  GC overhead limit exceeded , KBA , BC-XI-IBD , Integration Builder - Design , BC-XI-IBC , Integration Builder - Configuration , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.