Symptom
Error appears while checking consistency for Production Bill of Operations DEF (DEF refers to Bill of Operation id) after setting up a structure with Connection CONN_001 (CONN_001 refers to Connection id)
Bill of operations DEF not consistent
End reporting point must precede connection CONN_001
Environment
SAP Business ByDesign
Reproducing the Issue
-
Go to Planning and Production Master Data Work Center
-
Go to Production Bills Of Operation View
-
Search for DEF BOO
-
Select Edit
-
Check consistency for structure
-
Error appears
Bill of operations DEF not consistent
End reporting point must precede connection CONN_001
Cause
Reporting point is missing before connection element CONN_001 of Bill of Operations DEF.
Resolution
Maintain Reporting point before the connection.
You will have to add a MARK before CONN_001 as reporting point. Follow the below steps
-
Go to Planning and Production Master Data Work Center
-
Go to Production Bills Of Operation View
-
Search for DEF BOO
-
Select Edit
-
Navigate to Structure tab
- Select One step above to Connection element and select Insert Mark with Reporting Point Checked
Keywords
End reporting point must precede connection, Bill of operations not consistent,Connection error appears while checking the consistency of Bill of Operations , KBA , reporting point must precede connection , bill of operations not consistent , connection errors in boo , AP-PMM-PBO , Production Bill of Operations , Problem