SAP Knowledge Base Article - Preview

2790203 - CA97N does not display the material after changing the lot size of the assigned routing

Symptom

The material is no more displayed in CA97N Material Master Update after changing the minimum lot size of the routing in transaction CA02, despite that no error message is thrown and the change is saved correctly.

"Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental."

ca97n.png


Read more...

Environment

  • SAP ERP Logistics (LO)
  • SAP R/3
  • SAP R/3 Enterprise
  • SAP ERP Central Component
  • SAP ERP
  • SAP Enhancement package for SAP ERP
  • SAP Enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA, on-premise

Product

SAP ERP 6.0 ; SAP ERP Central Component all versions ; SAP R/3 Enterprise all versions ; SAP R/3 all versions ; SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

CA97N, CA02, Material Master Update, PP-BD-RTG, MARC-BASMG, PLKO-LOSVN, PLKO-LOSBS, Base quantity, Lot size, Routing, Losgröße, Arbeitsplan, Basismenge, RCPMAU03, BUILD_MAT_UPDATE_TAB , KBA , PP-BD-RTG , Routing , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.