SAP Knowledge Base Article - Preview

2806317 - Model is locked when Integrate Changes to Target Branch is canceled - SAP PD

Symptom

  • Any model has been checked in to the repository.
  • Changes made to the model have been checked into a change list.
  • The changelist was approved, but the integration of model changes has been canceled by the user.
  • The repository document is locked.
  • The Output view displays " - Locking the repository document..."
  • Other users cannot update the model in the repository.


Read more...

Environment

SAP PowerDesigner (PD) 16.6

Product

SAP PowerDesigner 16.6

Keywords

changelist, merge, 819527, CR819527, CR#819527 , KBA , BC-SYB-PD , PowerDesigner , Bug Filed

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.