SAP Knowledge Base Article - Preview

2832169 - SAP Cloud Integration Runtime Error: "The target server failed to respond"

Symptom

SAP Cloud Integration flow fail with Remotely Closed Connection error, while communicating with backend system such as Hybris Marketing, SuccessFactors etc.

  1. Inbound processing in endpoint at /PRD/c4c/ymkt/registeredproduct failed with message "Fault:Sequential processing failed for number 1. Exchange[ID-vsa6726847-38436-1563102567452-43-180864]. Caused by: [com.sap.gateway.core.ip.component.odata.exception.OsciException - HTTP Request failed with error : The target server failed to respond]", caused by "NoHttpResponseException:The target server failed to respond"
  2. Inbound processing in endpoint at /PRD/c4c/ymkt/registeredproduct failed with message "Fault:Sequential processing failed for number 0. Exchange[ID-vsa6463495-46574-1563102663218-43-174532]. Caused by: [com.sap.gateway.core.ip.component.odata.exception.OsciException - Service Unavailable : 503 : HTTP/1.0 ]", caused by "OsciExceptionService Unavailable : 503 : HTTP/1.0 "


Read more...

Keywords

SAP Cloud Integration, SAP HCI, SAP CPI, SCPI, SFSF, tenant, Integration Flow, deployment, model configurator, properties, tracing, payload, HCI tooling, HCI Flow, CPI integration flow, connection reset, target server , KBA , org.apache.http.nohttpresponseexception , LOD-HCI-PI-GB , Generation & Build Framework , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.