Symptom
During a system copy dbrefresh ASE specific method the error :
An error occurred while processing option SAP Business Suite 7i 2013
Support Release 2 > EHP7 for SAP ERP 6.0 ABAP Support Release 2 > SAP
ASE > System Copy > Target System > Standard System > Based on AS ABAP
> Refresh or Move Database Instance(Last error reported by the step:
Assertion failed: Unable to finish the database content refresh. Refer
to trace file sapinst_dev.log for further information).
Having a look at the sapinst_dev.log and find following error message:
(startInstallation)
Execution of the command "X:\sybase\SID\OCS-16_0\bin\isql.exe -e -w999
-Usapsso -SSID -X" finished with return code -1. Output:
Password:
Msg 4002, Level 14, State 1:
Server 'SID':
Login failed.
CT-LIBRARY error:
ct_connect(): protocol specific layer: external error: The attempt to
connect to the server failed.
Read more...
Environment
- SAP Adaptive Server Enterprise (ASE) 16.0 for Business Suite
- SAP Adaptive Server Enterprise (ASE) 15.7 for Business Suite
- SAP NetWeaver (NW) - All versions
- Software Provisioning Manager (SWPM) 1.0 SP26 PL7 and lower
Product
Keywords
KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview