SAP Knowledge Base Article - Preview

2841958 - Freight Unit not Rebuilding with Change controller strategy when shipping condition is changed on ERP

Symptom

  • In Transportation Management (SAP TM), when shipping type and shipping condition is updated on sales order in ERP system, change controller strategy is not triggered and new Freight Unit (FU) is not created
  • Change controller strategy is maintained with CANCEL_FOR and REBUILDFUH methods to cancel the existing Freight Order and build new Freight Unit
  • Freight Unit Building Rule (FUBR) condition is maintained in a way that new FUBR will be determined based on the shipping condition


Read more...

Environment

SAP Transportation Management 9.x

Product

SAP Transportation Management 9.1 ; SAP Transportation Management 9.2 ; SAP Transportation Management 9.3 ; SAP Transportation Management 9.4 ; SAP Transportation Management 9.5 ; SAP Transportation Management 9.6

Keywords

FUBR, rebuild, HARD_REBUILD_FUS, chaco, change controller strategy, shipping condition, type, service level, TRANSSRVLVL_CODE, FO , KBA , TM-PLN-FU-FUB , Freight Unit Building , TM-INT-LI , Logistics Integration - General , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.