Symptom
- While performing an Upgrade / S/4HANA Conversion, using the Software Update Manager (SUM) the phase VCH_MASS_MAINTENANCE_01 is taking longer than expected
- The following can be seen repeated many times in the SAPupConsole.log
Checking status of spawned ABAP job <job ID#>/VCH_MASS_MAINTENANCE_01 on original system...
Checking status of spawned ABAP job <job ID#>/VCH_MASS_MAINTENANCE_01 on original system...
Checking status of spawned ABAP job <job ID#>/VCH_MASS_MAINTENANCE_01 on original system...
Checking status of spawned ABAP job <job ID#>/VCH_MASS_MAINTENANCE_01 on original system...
Checking status of spawned ABAP job <job ID#>/VCH_MASS_MAINTENANCE_01 on original system...
- In SM37 the job VCH_MASS_MAINTENANCE_01 shows as Active
- Checking the Work Process log (work process information can be found in the Job Details) log entries similar to the one listed below can be seen:
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
M *** WARNING => DpResourcesOk: Many (warn limit exceeded) EG Memory (90.139 %) allocated
Read more...
Product
SAP S/4HANA 1809
Keywords
slow, too long, phase , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , BC-CST-MM , Memory Management , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview