SAP Knowledge Base Article - Preview

2882691 - Additional Production Systems functionality with Change cycle - Solution Manager 7.2

Symptom

While creating a Tasklist or Redefining landscape, there is an assignment block "Additional Production Systems".

2882691_1.png

In this table, you can add additional production systems that are not shown in the below tracks to the task list. The reasons why these systems are not shown in the tracks below might be e.g. there is no relevant transport route in TMS, RFC issue etc., you can come back to step1 to see detail in check result.


Read more...

Environment

SAP Solution Manager 7.2 SP08 and above

Product

SAP Solution Manager 7.2

Keywords

CHARM, Change request management, change control management, Systems without Transport Connection, track, source system, target, production, cycle document, change cycle, /TMWFLOW/SCMA_RSRLOGIN, SMIM, branch, /TMWFLOW/SCMA_REP_FOR_PROD, DIsplay All Change Documents for This Production SYstem, Check Prerequisites, Check Cluster Assignment, Phase cycle. , KBA , SV-SMG-CM , Change Request Management , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.