SAP Knowledge Base Article - Preview

2921106 - System termination when running controlling period end closing apps

Symptom

Processing time taking too long and system terminated when running controlling period end closing apps. (Variance Calculation, Overhead Calculation, Order Settlement, Actual Costing...)


Read more...

Environment

SAP S/4HANA Cloud Public Edition

Product

SAP S/4HANA Cloud Public Edition all versions

Keywords

RZ11, rdisp/scheduler/prio_high/max_runtime, rdisp/scheduler/prio_low/max_runtime, rdisp/scheduler/prio_normal/max_runtime, by period, by lot, KKS1, KKS6 KKS5, short dump, timeout, foreground, background, schedule product costing jobs, co88, settlement, wip calculation, period end closing, return, home page, jump out, back, terminate, backend, frontend, cloud, ui5, fiori, acutal cost rate calculation, overhead allocation, overhead calculation, actual settlement, missing timesheet, unposted time confirmations, replicate run time hierarchy, universal allocation run, event-based posting, WIP Quantity Posting, Postprocess, product costing, preliminary settlement, co-product, production settlement, work in process, wip, edit costing runs, edit actual costing runs, termination, crash, Running Time, Processing Time, deletion flag. , KBA , CO-PC-OBJ-PER-2CL , Product Cost by Period (Public Cloud) , CO-PC-ACT , Actual Costing , CO-OM-OPA-F , Period-end Closing , CO-PC-PCP , Product Cost Planning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.