Symptom
- In a project diagram, dependency links are displayed between model symbols.
- It should be possible to move the extremity of a dependency link between graphical synonyms of the same target model.
- It works fine for traceability links.
Read more...
Environment
- SAP PowerDesigner (PD) 16.6
- SAP PowerDesigner (PD) 16.7
Product
SAP PowerDesigner 16.6 ; SAP PowerDesigner 16.7
Keywords
arrange, attach, point, 821898, CR821898, CR#821898 , KBA , BC-SYB-PD , PowerDesigner , Bug Filed
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.