Symptom
- In a project diagram, dependency links are displayed between model symbols.
- It should be possible to move the extremity of a dependency link between graphical synonyms of the same target model.
- It works fine for traceability links.
Read more...
Environment
- SAP PowerDesigner (PD) 16.6
- SAP PowerDesigner (PD) 16.7
Product
SAP PowerDesigner 16.6 ; SAP PowerDesigner 16.7
Keywords
arrange, attach, point, 821898, CR821898, CR#821898 , KBA , BC-SYB-PD , PowerDesigner , Bug Filed
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview