Symptom
When you are doing S/4 HANA 1909 conversion with SUM, an error occurred in phase "MAIN_SHDPREPUT/PREPREPUT_ESP_IMPORT". In the phase error log file "REPREPUT.ELG", the following error message can be found.
****************************
4 ETW000 R3trans was called as follows: D:\SUM\SUM\abap\exe\R3trans.EXE -w D:\SUM\SUM\abap\tmp\R750ESPXXX -u 1 D:\SUM\SUM\abap\tmp\PREPREPUT.CTRL
4 ETW000 active unconditional modes: 1
2EETW169 no connect possible: "connect failed with DBLI_RC_LOAD_LIB_FAILED."
****************************
Read more...
Environment
S/4 HANA 1909 Conversion with SUM.
Product
Keywords
"connect failed with", DBLI_RC_LOAD_LIB_FAILED, "MAIN_SHDPREPUT/PREPREPUT_ESP_IMPORT" , KBA , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.