Symptom
On SAP ASE systems with ASE parallelism configured:
- tempdb database runs out of log space (Error 1105) during ASE parallel query execution
- The parallel queries involve Hash Join operations
- These spids hang and cannot be terminated via ASE KILL command in isql.
- The stacktrace for these spids references the following functions:
uwpredisconnect
err_disconnect_allchildren
err_pll_primary_processing
On systems running SAP BW applications and SAP Solution Manager systems:
- the report SAP_BWTOOLPGM_SYB (executed via t-code SE38) shows several Infocubes with more than 1000 partitions
- Multiple occurrences of Error 540 are seen in the ASE errorlog (see SAP KBA 2833526)
- stacktraces are reported in the ASE errorlog referencing LeHash functions (see SAP KBA 3126590)
- serveral ASE processes (spids) are hung and cannot be terminated via ASE KILL command in isql.
- The stacktrace for these spids references the following functions:
uwpredisconnect
err_disconnect_allchildren
err_pll_primary_processing
Read more...
Environment
- SAP Adaptive Server Enterprise (ASE) 16.0 for Business Suite
- SAP NetWeaver (NW) - All versions
- SAP Solution Manager (SOLMAN) 7.2
- SAP Adaptive Server Enterprise (ASE) 16.0
Product
SAP NetWeaver 7.5
Keywords
tempdb, 1105, parallelism, 'parallel query', kill, 823671, CR 823671, CR823671,err_pll_secondary_processing , KBA , BW-SYS-DB-SYB , BW on Adaptive Server Enterprise , BC-SYB-ASE , Sybase ASE Database Platform (non Business Suite) , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview