SAP Knowledge Base Article - Preview

3033810 - GC overhead limit exceeded: SAP BC issue

Symptom

SAP Business Connector (SAP BC) fails to start (or is unstable) and the below error is recorded in the trace files (../sapbc48/server/logs*):

*********************************
Exception in thread "SAP Business Connector Server"
java.lang.OutOfMemoryError: GC overhead limit exceeded
*********************************


Read more...

Environment

  • SAP Business Connector
  • Release Independent

Product

SAP Business Connector all versions ; SAP ERP 6.0

Keywords

sap business connector memory, SAP BC developer, shuts down, 4.8, 4.7 <Developer>/bin/integrator.bat integrator.sh Caching clear cache server.cnf sapbc48\Server\config server.cnf watt.net.ssl.server.strongcipheronly 1240081 initialization configuration  ../sapbc48/server/config. set ACL notepad restore file system backup , KBA , BC-MID-BUS , Business Connector , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.