Symptom
- Is possible to change the 'Date of Manufacture' for a Batch during a Goods Receipt posting.
Environment
- S/4 HANA Cloud
Reproducing the Issue
- Post Goods Movement.
- Choose Goods Receipt / Other.
- Enter Material / Plant / Storage Location / Batch details.
- Date of Manufacture is taken from the Batch Master.
- Date of Manufacture field is open to change the date.
Cause
Message '12004 Production date of bch &1 (&2) does not match the prod. date entered (&3)' is set as a Warning.
Resolution
- From Manage my Solution
- Choose Logistics / Inventory.
- Set System Messages in Inventory Management / SSCUI 103897
- For message 12 004 this is set as 'W' Warning, change this to 'E' Error.
- Save.
- Go to Post Goods Movement.
- Choose Goods Receipt / Other.
- Enter Material / Plant / Storage Location / Batch details.
- Date of Manufacture is taken from the Batch Master.
- Change the Date of Manufacture date.
- Press check.
- Error '12004 Production date of bch &1 (&2) does not match the prod. date entered (&3)' is raised, preventing the change, posting.
** In the standard SAP system, when we post a goods issue the system does not check the Production / SLED Dates in the Batch as standard. The check is only performed when posting a Goods Receipt.
Keywords
'Date of Manufacture, Production date, Batch, Change, Prevent, Restrict, Stop, Post Goods Movement, MIGO, Manage my Solution, Set System Messages in Inventory Management, SSCUI, 103897, OMCQ, Warning, Error, Goods Receipt, Goods Issue the system does not check the Production Date for the Batch, Production Date, 101913, Set Expiration Date Check , KBA , MM-IM-GR-MIGO , Goods Receipt from External Procurement (MIGO) , MM-IM-GR , Goods Receipt , MM-IM-GR-MIGO-2CL , Goods Receipt from External Procurement (MIGO) (Public Cld) , How To