SAP Knowledge Base Article - Preview

3073642 - The status of consolidation changes to “to be executed” in another entity that does not belong to the scope of the posted journal - BPC

Symptom

  • After executing the consolidation process, post a journal entry in scope “A”, in currency of the group “EUR” and for a specific entity. The status of consolidation process automatically changes to “to be executed” in another entity that does not belong to the scope where the journal was posted.
  • We have already see the note 2493093 – The status of consolidation is changed to “to be executed” again after a journal posting and it makes sense if the status of the entity that I make a posting changes, but in this case, other entities in other subgroups change your status.


Read more...

Environment

  • SAP  Business Planning and Consolidation 11.1 for Netweaver.

Product

SAP BW/4HANA 2.0

Keywords

EPM, BPC  NW, Business Planning and Consolidation for NetWeaver, SAP BPC FOR NetWeaver, BPCNW, Embedded, standard, classic, unified, BOPC, account calculation, script logic, SL, journal, jrnl, manual adjustment, consolidation, process, scope, Starter Kit for IFRS, “to be executed”, post journal, , KBA , EPM-BPC-BW4-CON-JNL , BPC/4 - Journals , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.