SAP Knowledge Base Article - Preview

3089209 - The message "Unable to update scheduling for procedure Database Extractor Setup" happened during 'Managed System Configuration' - SAP BS on ASE

Symptom

  • Database Extractor Setup failed due to the error message: "Error while scheduling data collector." 
  • The procedure 'SP_COLLECT_DBH_SYSTIMESPENT' could not be updated for scheduling.

    Exception CX_DBA_DBH_SETUP in program RAGS_SISE_ACTIVITY_JOB  line 0 

    Message:                       Error while scheduling data collector

    Message:  Unable to update scheduling for procedure 'SP_COLLECT_DBH_SYSTIMESPENT'.

    SQL statement: sybmgmtdb..sp_sjobdrop

  • SQL Message: [ASE Error SQL30046:08S01][SAP][ASE ODBC Driver] Connection to the server has been lost. Connection terminated while reading from socket. ERRNO returned




Read more...

Environment

  • SAP Adaptive Server Enterprise (ASE) 15.7 for Business Suite
  • SAP Adaptive Server Enterprise (ASE) 16.0 for Business Suite

Product

SAP Adaptive Server Enterprise 16.0 ; SAP NetWeaver all versions

Keywords

Error: 30046, Error 30046, 30046 , KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.