Symptom
- The user is unable to launch EPM Add-in report(s) from BPF , opening the report(s) from EPM Add-in directly works as expected.
- Refreshing the EPM Add-in report leads to the following error:
EPM - General error
Error in RefreshSheet
Details:
The execution of the report xxxxx failed. Please contact your administrator.
500 Connection Timed out.
Read more...
Environment
SAP Business Planning and Consolidation (BPC) 10.1 version for SAP NetWeaver (NW).
SAP Business Planning and Consolidation (BPC) 11.0 version for SAP BW/4HANA.
SAP Business Planning and Consolidation (BPC) 11.1 version for SAP BW/4HANA.
Product
Keywords
icm/server_port[2], timeout, launch, EPM, BPF, Open report, 500 timeout, error refresh sheet, 500 Connection, refresh sheet, contact your administrator. , KBA , EPM-BPC-NW-BPF , Business Process Flow , EPM-XLS-NW , EPM Excel Client BPC NW , How To
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.