SAP Knowledge Base Article - Preview

3089887 - Unable to launch an EPM Add-in report from BPF in BPC 10.1/11/11.1

Symptom

  • The user is unable to launch EPM Add-in report(s) from BPF , opening the report(s) from EPM Add-in directly works as expected.
  • Refreshing the EPM Add-in report leads to the following error:

            EPM - General error

            Error in RefreshSheet

            Details:

            The execution of the report  xxxxx failed. Please contact your administrator.

            500 Connection Timed out.


Read more...

Environment

SAP Business Planning and Consolidation (BPC) 10.1 version for SAP NetWeaver (NW).
SAP Business Planning and Consolidation (BPC) 11.0 version for SAP BW/4HANA.
SAP Business Planning and Consolidation (BPC) 11.1 version for SAP BW/4HANA.

Product

SAP NetWeaver 7.4

Keywords

icm/server_port[2], timeout, launch, EPM, BPF, Open report, 500 timeout, error refresh sheet, 500 Connection, refresh sheet, contact your administrator. , KBA , EPM-BPC-NW-BPF , Business Process Flow , EPM-XLS-NW , EPM Excel Client BPC NW , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.