SAP Knowledge Base Article - Preview

3121084 - CPI payload logging took too much time, large payload.

Symptom

  • Iflow processing time is much longer than expected, the processing time was mainly in the step of payload logging in CPI. 


Read more...

Environment

  • SAP Cloud Integration.

Product

SAP ERP 6.0

Keywords

MPL Attachment, circuit breaker, payload, message payload, SAP HANA Cloud Integration, SAP HCI, SCI, SAP CPI, SCPI, tenant, IFlow, Integration Flow, deployment, model configurator, properties, tracing, payload, missing attachment , KBA , LOD-HCI-PI-OPS , Cloud Operations , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.