SAP Knowledge Base Article - Public

3147339 - Report Does Not Display Multi-Level Hierarchy For Bill Of Material

Symptom

You want to see the Multi-Level BoM Visualization in a report however system is not displaying data more than one level for a Bill of Material.

Environment

SAP Business ByDesign

Reproducing the Issue

  1. Go to the Business Analytics workcenter.
  2. Go to Design Data Sources view.
  3. Find IDs: SCMPBOMU02 (Production Bills of Material Variant and Assigned Line Item Details) and SCMPBOMU (Production Bills of Material Variant and Assigned Line Item Details).
  4. Select and Preview one by one.
  5. Enter all the required details i.e. BoM ID.
  6. Here system displays Input and Output Product with required details at level one only.

Cause

Currently, Multi-Level BoM Visualization is not available in a report. It displays data at one level of BoM hierarchy only.

Resolution

  1. Go to Planning and Production Master Data work center.
  2. Go to Planning and Production Master Data view.
  3. Select any required Bill Of Material ID.
  4. Choose Multi-Level BoM Visualization.
  5. The system displays all levels of hierarchy of required Bill of Material.
  6. Now users can export the details to excel via option Export and check the levels.

Keywords

Bill of Material, SCMPBOMU02 ,SCMPBOMU ,Multi-Level BoM Visualization, , KBA , bill of material, , scmpbomu02 ,scmpbomu , multi-level bom visualization, , AP-PMM-BOM , Production Bill of Material , How To

Product

SAP Business ByDesign all versions