Symptom
- After an SAP KERNEL upgrade from 7.53 PL 800-series to PL900 or PL921, the SAP system does not start.
- The following errors are received in the developer / work process trace file:
ASE configuration parameter expand numeric truncated scale has value 0, must have value 1
incorrect values for ASE configuration parameters found. Cannot continue.
CheckAseConfig failed. Connect terminated.
***LOG BY2=> sql error 99980 performing CON [dbsh 1289]
***LOG BY0=> [ASE Error SQL99980]incorrect values for ASE configuration paramteres found. Cannot continue. [dbsh 1289]
***LOG BY2=> sql error 99980 performing CON [dblink 644]
***LOG BY0=> [ASE Error SQL99980]incorrect values for ASE configuration paramteres found. Cannot continue. [dblink 644]
***LOG R19=> ThDbConnect, db_connect ( DB-Connect 000256) [thDatabase.c 88]
in_ThErrHandle: 1
*** ERROR => ThInit: db_connect (step TH_INIT, thRc ERROR-DB-CONNECT_ERROR, action STOP_WP, level 1) [thxxhead.c 2805] - Other possible errors:
ASE configuration parameter exception on rounding overflow has value 0, must have value 1
ASE configuration parameter expand numeric truncated scale has value 0, must have value 1
ASE configuration parameter restricted parameter markers has value 0, must have value 1
incorrect values for ASE configuration parameters found. Cannot continue.
CheckAseConfig failed. Connect terminated.
C ERROR: -1 in function CheckAseConfig (SQLExecDirect failed) [line 53009]
C (30046) [08S01] [SAP][ASE ODBC Driver]Connection to the server has been lost. ASE Terminated the
C connection. Check the server to determine the status of any open transactions.
C syb_glob.dbsl_ca.errclass set to DBSL_EC_RESTART
C ERROR: -1 in function CheckAseConfig (SQLExecDirect failed) [line 53009]
C (5702) [ZZZZZ] [SAP][ASE ODBC Driver][Adaptive Server Enterprise]ASE is terminating this process.
C
C CheckAseConfig failed. Connect terminated.
B ***LOG BV3=> severe db error 30046; work process is stopped [dbsh 1284]
B ***LOG BY2=> sql error 30046 performing CON [dblink 644]
B ***LOG BY0=> [ASE Error SQL30046:08S01][SAP][ASE ODBC Driver]Connection to the server has been lost. ASE Terminated the connection. Check the server to determine the status of any open transactions. [dblink 644]
Read more...
Environment
- SAP Adaptive Server Enterprise (ASE) 16.0 for Business Suite
- SAP Adaptive Server Enterprise (ASE) 15.7 for Business Suite
- SAP NetWeaver (NW) - All versions
- SAP Kernel 7.53 PL800 and above
Product
SAP Adaptive Server Enterprise 16.0
Keywords
Kernel, upgrade, CheckAseConfig, dispatcher, starting, start, configuration, parameter, "expand numeric truncated scale" , KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.