Symptom
After upgrade, orders changed in Embedded PPDS (ePPDS) not getting sent to S4Core anymore, in the scenario, where ePPDS on S4HANA was already being used with the S/4HANA system before the upgrade.
The system before upgrade was on a release from 1610 to 1909, planned and production orders were created in the system before upgrade for PPDS relevant Materials.
With this scenario, an upgrade to S4HANA 2020 or higher has been completed.
Read more...
Environment
System release before upgrade:
from SAP S4HANA 1610 to SAP S4HANA 1909
System release after upgrade:
SAP S4HANA 2020 and higher
Product
Keywords
planned order, production order, PPSKZ, not send, S4HANA 2020, /SAPAPO/MATPLSTA, XPRA , KBA , SCM-APO-INT-PPS , PP-DS / Production and Process Order , SCM-APO-PPS , Production Planning and Detailed Scheduling , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.