Symptom
- You want to activate the flag 'Advanced planning' in the material master data, however, it is not possible because the MRP area is not available in PP/DS
- It is presented the following message when changing material at MM01 / MM02:
'Create MRP area XXXXX as SCM location' - The requirement is to plan only the material at Advanced Planning (PP/DS) and to plan the MRP area in S/4 HANA side
Read more...
Environment
- SAP Supply Chain Management
- SAP Advanced Planning and Optimization
- S/4 HANA
Product
SAP S/4HANA 2020
Keywords
KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , LO-MD-MM , Material Master , SCM-APO-MD-PR , Product , SCM-APO-INT-MD-LO , Location , How To