Symptom
You maintain the planning parameter for a material as follow:
1. MRP Type: VB – Reorder Point Planning
2. Lot Sizing Procedure: HB – Replenish to maximum stock level
3. Max. Stock Level: 1 - generate requirements based on Maximum stock level after covering requirement (This can be set in SSCUI 101112 - Check Lot-Sizing Procedures)
Based on the definition of "Max. Stock Level", if it is set to "1", the lot size should be "maximum stock level + total requirements - current warehouse stock - existing fixed receipt elements". However, after the MRP run, the purchase requisition generated just consider the maximum stock level but doesn't cover the existing requirements for the material.
Read more...
Environment
SAP S4HANA Cloud
Keywords
MRP Type, VB, Lot Sizing Procedure, HB, Max. Stock Level, SSCUI 101112 - Check Lot-Sizing Procedures, SSCUI 101171 - Check MRP Types, Include ext. reqmts , KBA , PP-MRP-2CL , Material Requirements Planning (Public Cloud) , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.