SAP Knowledge Base Article - Preview

3218819 - The inspection lot summary doesn't work as expected when posting the same batch in two lines or using batch split when posting GR in TA MIGO

Symptom

  • Symptom1.
    Setting of the lot summary in the material master is '1'. One inspection lot has to be created for the same material, batch and storage location. Two/more items are posted for the same material and batch at the same time in MIGO. One inspection lot is created at the time of goods receipt (GR). The actual inspection quantity only contains the value from the second/last line. The quantity should be summarized from all the items.
  • Symptom2.
    Setting of the lot summary in the material master is initial. No lot summary has to be occurred, a separate inspection lot has to be created for each item. At the time of GR a batch split happens. If the distributed quantity is the same, only one inspection lot will be created for the last batch and assigned to the first material item. If the distributed quantity is different in batches, more inspection lots will be created but all of them will be assigned to the first material document item.


Read more...

Environment

  • SAP ERP Quality Management (QM)
  • SAP Enhancement package for SAP ERP
  • SAP Enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA, on-premise

Product

SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions ; SAP enhancement package for SAP ERP, version for SAP HANA all versions

Keywords

QM-IM-IL, MM-PUR-GF-CPE, Charge, Chargensplit, Loszusammenfassung, Engine für Commodity-Preisfindung, Commodity Pricing Engine, ECP, Wareneingang, QAMB, QALS-LOSMENGE , KBA , QM-IM-IL , Inspection Lot Creation , MM-PUR-GF-CPE , CPE in MM , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.