SAP Knowledge Base Article - Preview

3249614 - After transport of Connector configuration ,connector is missing when executing sync jobs in GRC even though the required SPRO configuration is done

Symptom

You performed the transport of connector configurations in SPRO from one system to another (eg. DEV to QA) and then in the transported system, you are unable to view the connectors while performing synch jobs.


Read more...

Environment

GRC 10,10.1,12.0

Product

SAP Access Control 12.0

Keywords

Connector missing,synch jobs,GRC , KBA , GRC-SAC-ARQ-GL , GreenLight xPAC for Access Request , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.