Symptom
- When you schedule two jobs with a predecessor-successor relationship (start condition "Start after job"), you can schedule the predecessor periodically, but not the successor. The BTC_EVENT_RAISE program is now available to solve this technical problem.
- Job Scheduled does not repeat the chain after Rescheduled.
Read more...
Product
SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5
Keywords
BTC_EVENT_RAISE, SAP_END_OF_JOB, Start after job, SM62, SM64, dependency, predecessor, successor, periodically, after job, sequence, completion, triggered job chains , KBA , BC-CCM-BTC , Background Processing , How To