Symptom
You have connected the ABAP's SPROXY Proxy Generation tool in your backend ABAP Application System with the PI Java ESR design-time tool in your central PO system via the standard SM59 HTTP destination SAP_PROXY_ESR.
On the left-hand navigation tree expanding the SWCV the UI hangs.
However every connection check test for SPROXY shows that everything is fine and properly configured.
Read more...
Environment
- PI Release Independent
- SAP NetWeaver
- SAP Process Integration
Product
Keywords
Process Integration 7.0, PI 7.0, PI 7.01, PI 7.02, Process Integration 7.10, PI 7.10, Process Integration 7.11, PI 7.11, Process Integration 7.30, PI 7.30, Process Integration 7.31, PI 7.31, Process Orchestration 7.40, PI 7.40, PO 7.40, Process Orchestration 7.50, PI 7.50, PO 7.50, NetWeaver, XI, SPROXY, hangs, SAP_PROXY_ESR, UI-tree, Java ESR , KBA , BC-XI-IBD-INF , Interfaces , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.