Symptom
When confirming a production order, you change something in the material movements tab. Then you change the yield, scrap or unit of measure and the material movements tab is updated to the original entries.
Environment
SAP S/4HANA Cloud
Reproducing the Issue
- Go to Confirm Production Operation app.
- In material movements, change the original values.
- Save.
- Change the yield, scrap, or unit of measure of the order.
- Click enter.
- Entries in material movements are reset to the original entry.
Cause
Standard system behavior.
Resolution
This is the standard system behavior of the 'Confirm Production Operation' app, you can see the same behavior in Confirm Production Order Operation (CO11N).
When a later change is made to the quantity (yield, scrap, or unit of measure), the components that need to be posted to/issued from stock are changed and are therefore recalculated. Any changes previously entered for individual components, as well as any unplanned goods movements, are lost.
Please, after changing the yield, scrap or unit of measure, check the goods movements and make any necessary changes/additions to the goods movements list, before saving the confirmation.
Keywords
Reset, Confirm Production Operation, app, S/4HANA Cloud, storage location, change, update, wrong, RU 141, RU141, Goods movements redetermined due to quantity change, goods movements. , KBA , PP-SFC-EXE-CON-2CL , Confirmation (Public Cloud) , PP-FIO-SFC-2CL , Fiori UI for Production Orders (Public Cloud) , Problem