Symptom
This document aims to clarify questions about Cost Object Controlling which are related to the standard system behaviors and troubleshooting. It contains a large list of SAP notes, KBAs and related documents, separated by topic.
Summary:
- Cost Object Controlling Scenarios
- Performance in Period End Closing
- WIP/Results Analysis
- Variance Calculation
- Settlement
- Orders cannot be closed/Deletion flag cannot be set
- S/4HANA
Read more...
Environment
- Controlling (CO)
- SAP ERP
- SAP Enhancement package for SAP ERP
- SAP Enhancement package for SAP ERP, version for SAP HANA
- SAP S/4HANA
- SAP S/4HANA Finance
Keywords
KBA, cost object controlling, CO, CO-PC, CO-PC-OBJ, period end closing, too long, runtime, performance, SM37, KKAX, KKAO, KKS1, KKS2, RKKKS1N0, KO88, CO88, RKO7CO88, RKO7VA88, KKAS, KKS5, KKS6, MFN1, CON2, RKAZCON2, increased, rapidly, fast, slow, parallel processing, deletion flag, detail list, line items, schedule manager, SCMO, SCMA, SAPKKA00, SAPKKA00BG, SAPKKA07, RKAZCO43, CO43, RKAZKGI4, RKAZVA44, WIP, results analysis, variance calculation, settlement, overhead calculation, month end closing, PEC, longer, higher , KBA , CO-PC-OBJ , Cost Object Controlling , How To
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.