Symptom
In SCC3, the processing Status of client copy is FINISHED, however in "General Messages" tab, it shows following error:
==================
Message Type ●
Exit-Method PHASE_COPY_SOURCE_TO_TARGET
Phase WAIT_FOR_LAST_TASK
Message PP:CL_SCCR_TABLE_RFC_SELECT_DESTNCP/CL_SCCR_TABLE_RFC_SELECT_DESTNCM005(4):Time limit exceeded
==================
Read more...
Environment
SAP S/4HANA All versions
Product
SAP NetWeaver 2004 ; SAP NetWeaver 7.0 ; SAP NetWeaver 7.1 ; SAP NetWeaver 7.2 ; SAP NetWeaver 7.3 ; SAP NetWeaver 7.4 ; SAP NetWeaver 7.5 ; SAP enhancement package 1 for SAP NetWeaver 7.0 ; SAP enhancement package 1 for SAP NetWeaver 7.3 ; SAP enhancement package 2 for SAP NetWeaver 7.0 ; SAP enhancement package 3 for SAP NetWeaver 7.0
Keywords
rdisp/max_wprun_time, rdisp/scheduler/prio_low/max_runtime, Time limit exceeded , KBA , BC-CTS-CCO , Client Copy (For ByD issues select BC-TLM-CP) , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.