Symptom
Release SAP_BYD 1234 of solution is not compatible with system.
Environment
- SAP Cloud Application Studio
- SAP Hybris Cloud for Customer
- SAP Business ByDesign
Reproducing the Issue
- Login to SDK of the target tenant
- Upload the solution
- Deployment failes with the mentioned error
Cause
You have attempted to deploy solution which has been assembled in previous release. Tenant on to which you wish to deploy the solution is however on higher release.
Deployment landscape, as per SAP system architecture operates in the following way: Deployment of solution works only if solution is being deployed on a system which is n+2 releases from the one on which .zip file has been created (meaning solution has been assembled)
This means that for example, a PDI solution got downloaded from a tenant with release 2102. This solution can be uploaded to a tenant with release 2102, 2105 and 2108. The upload will fail on a system with release 2011 (lower release) and 2111 (3 releases ahead).
Resolution
- Login to the SDK with TEST tenant URL
- Go to implementation manager tab
- Go to Current Version Tab
- Click Assemble & Download button
- Re-upload the new download button
See Also
https://help.sap.com/docs/SAP_CLOUD_APPLICATIONS_STUDIO/cbcebe3cfb1647a8b0322c18dbb0b481/73ae01a173e210148794d5a02b1f9317.html?q=Solution%20version%20upload
Keywords
Release SAP_BYD of solution is not compatible with system, solution deployment failed, previous release, higher release , KBA , AP-RC-BDS-LM , ByDesign Studio Lifecycle Management , Problem