SAP Knowledge Base Article - Preview

3327474 - MRP controller and lot sizing procedure mandatory

Symptom

MRP controller (MARC-DISPO) and lot sizing procedure (MARC-DISLS) are mandatory in t-code MM01/MM02, although they're configured as optional fields in material master field selection. 


Read more...

Environment

  • SAP ERP Logistics (LO) 
  • SAP R/3 
  • SAP R/3 Enterprise 
  • SAP ERP Central Component 
  • SAP ERP 
  • SAP Enhancement package for SAP ERP 
  • SAP Enhancement package for SAP ERP, version for SAP HANA
  • SAP S/4HANA, on-premise

Keywords

M3069, M3071, MARC-DISPO, MARC-DISLS, MARC_DISPOMUSS, T438A-DISVF, ND, RP , KBA , LO-MD-MM , Material Master , PP-MRP , Material Requirements Planning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.