Symptom
When connecting to an ABAP system via RFC (for example: from another ABAP system or a product using JCo/NCo) the initial connection/logon time is much higher than subsequent calls.
For example, an SM59 connection test from one ABAP system (the RFC client) to another ABAP system (the RFC server):
The Cause and Resolution of this article only applies provided the following:
- The RFC server is a NetWeaver AS ABAP or ABAP platform system. (The "target ABAP system".)
- The destination/connection from the RFC client to the target ABAP system is configured to use load balancing.
- The logon group defined in SMLG of the target ABAP system is configured with "Ext. RFC-enabled" set to enabled/true.
Read more...
Environment
NetWeaver AS ABAP or ABAP Platform system acting as the RFC server
Product
Keywords
KBA , BC-CCM-CNF-GRP , Workload Balancing and Group Management , BC-CST-LG , Logon group based load balancing , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview