Symptom
In app "Stage Materials for Production" (MF60), no material can be found in the pull list.
Environment
SAP S/4HANA Cloud Public edition
Cause
Possible reasons :
- There is sufficient stocks and therefore there is no need to replenish it automatically.
- The Selection Horizon is not long enough to cover the requirement.
- Classical KANBAN control cycle was created against the material although it is not expected.
- Master data is not maintained properly.
For instance, control cycle was created against EWM supply area whereas it is an IM managed scenario.
The source storage location, staging indicator in the control cycle is incorrect etc.
Resolution
For the 1st root cause, if you still want to replenish manually, you can tick off the indicator 'Display missing quantities only' in Global Settings from the initial screen.
For the 2nd root cause, please adjust the Selection Horizon to a date far away in order to cover the requirement date.
For the 3rd root cause, the pull list only supports event-driven Kanban. If the created KANBAN control cycle is not intentional, please delete it.
For the 4th root cause, follow the scope items e.g. 3DV to double check all of the prerequisite and master data.
See Also
Keywords
planned order, production order, pull list, stage, MF60, Stage Materials for Production, BJH, 3DV , KBA , PP-REM-2CL , Repetitive Manufacturing (Public Cloud) , Problem