SAP Knowledge Base Article - Preview

3340683 - IBP: Flow-through lead time does not appear to be calculated correctly - IBP for Inventory

Symptom

  • The value of the Inventory flow-through key figures (CALCTLEADTIME and/or CALCPLEADTIME) do not appear to be correct.
  • For example, at a product/location the CALCPLEADTIME key figure is greater than the input PLEADTIME. 
  • This is behaving like there is a non-stocking location upstream, resulting in the flow-through logic applying, but the upstream node is stocking.

"Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental."


Read more...

Environment

SAP Integrated Business Planning for Supply Chain (SCM-IBP)

Product

SAP Integrated Business Planning for Supply Chain all versions

Keywords

ibp, inventory, msio, io, inv, meio, flow-through, flow, thru, lead time, leadtime, doesn't, seem, calculate, PLEADTIME, CALCPLEADTIME, TLEADTIME, CALCTLEADTIME, correctly, correct, SAFETYSTOCKPOLICY, LOCATIONPRODUCT , KBA , SCM-IBP-INV , Inventory Planning , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.