SAP Knowledge Base Article - Preview

3342761 - Plant and shipping point location creation issue: DRF ECC to TM

Symptom

  • You're replicating plant or shipping point from SAP ECC system to SAP S/4HANA.
  • LocationBulkReplicationRequest_In message is processed successfully in target system but no corresponding locations are created.
  • In confirmation message LocationBulkReplicateConfirmation_Out from the target system, you find below error:
    "External location identifier initial (/SAPAPO/LOM 001)"


Read more...

Environment

  • SAP enhancement package 7 for SAP ERP 6.0
  • SAP enhancement package 8 for SAP ERP 6.0
  • SAP S/4HANA

Product

SAP ERP all versions ; SAP S/4HANA all versions

Keywords

LocationOriginObjectID, /SCMB/CL_LOCBULKREPL_REQSRV, LocationBulkReplicationRequest_In, LocationBulkReplicationRequest_Out, LocationBulkReplicationConfirmation_Out, CL_PLANT_LOC_DRF_OUTBOUND, CL_SHPP_LOC_DRF_OUTBOUND, DRF, 464_L, DRF_0045_L. , KBA , TM-MD-TN-LOC , Location , TM-BF-INT , Integration , SCM-BAS-MD-LO , Location , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.