Symptom
You create material cost estimate with app Create Material Cost Estimates. In the result screen, you find the material components are different with the items you can see from the BOM.
Environment
SAP S/4HANA Cloud Public Edition
Cause
You managed the BOM items with change number. If you check the relevant change number with app Mange Change Masters, you may say either the change master is without release key, or even it's with release key, it's without correct selection.
Resolution
First, you may check the BOM with app Display Material BoM.
In the selection screen, choose a valid from date which is early enough (for example, some years ago).
If the selection is correct, you should be able to see all the items managed by change number.
Then you can check the latest change number with app Mange Change Masters to see the field "Function".
If it's "Without release key", the change number will not work for costing.
You need to create a new change number with app Create Change Master, and select "Without release key". Assign the change number to the BOM items you want to change.
In app Create Change Master, you should also check the selection for "release key", it needs to include status "release for costing" or "global release".
Otherwise, the change number won't work for costing.
See Also
3212531 Components different in material BOM and material cost estimate
1891235 Components differ in BOM and Production Order
Scope Item 3LO
Keywords
Change number, CK11N, cost estimate, CS03, BOM, bill of material, missing, additional, corresponde, corresponding, mismatch, component, material, item, more, match. , KBA , CO-PC-PCP-2CL , Product Cost Planning (Public Cloud) , LO-MD-BOM-2CL , Bills of Material (Public Cloud) , PP-SFC-EXE-2CL , Order Execution (Public Cloud) , Problem